How to get your industrial PCs in just 3-7 days despite the global raw materials shortage

The Covid-19 outbreak has not only caused severe damages to worldwide health but has also had serious repercussions on the global economy. Restrictive measures, extensive lockdowns, and production halts have led to a raw materials shortage severely impacting all sectors, from the building industry to manufacturing.

Among these, several industrial PC brands on the market have been affected, too. As a consequence, shipping and deliveries got delayed. At such a difficult time, being left without a PC for 8 to 10 weeks (or more) is not sustainable, especially if you need to complete urgent projects or you have to cope with prolonged downtime due to the absence of machinery.

How to effectively solve this issue?

Despite the global shortage we are currently experiencing, we at Kimera Computers can ensure very rapid industrial PC deliveries: from 3 to 7 days on average, and only in certain cases from 15 to 20 days. In this way, you will be able to cope with downtime and get back to your projects in about a week – as opposed to the 8 to 10 weeks on the market. You will thus significantly boost your business productivity even in the ongoing situation.

This is possible for two reasons. First, because Kimera Computers is a brand of industrial PCs entirely made in Italy: we design, manufacture, and test them directly at our facility, which allows us to eliminate the whole distribution chain of brands produced abroad.

Second, because of our synergy with non-Asian producers. We work with selected and certified suppliers: in this way, Asian supply-related issues no longer arise, and delivery times are significantly reduced.

Last but not least, we provide several types of industrial PCs for immediate delivery:

  • Small Rack PCs
  • Fanless and non-fanless Box PCs
  • Ultra-slim PCs
  • Customised PCs according to your specific needs.

We, too, are facing the difficulty of materials sourcing. Nevertheless, our production process and collaboration with selected suppliers allow us to ensure rapid deliveries of industrial PCs even in this historic moment, thus optimising your project times and your business productivity.

How to get your industrial PCs in just 3-7 days despite the global raw materials shortage

L'autore

MatteoPinato

Request information